Delivery and Erection Delivery is made to a location nearest to the site, which is easily accessible to normal, over the road tractor trailor equipment. All trucks delivering bridge materials will need to be unloaded at the time of arrival. Erection of the bridge structure to be done by manufacturer or an AISC Certified Erector. The manufacturer will provide detailed, written instructions in the proper lifting procedures and splicing procedure (if required). The method and sequence of erection shall be the responsibility of the manufacturer of the supplied bridge or an AISC Certified Erector. The bridge manufacturer shall provide written Inspection and Maintenance Procedures to be followed by the bridge owner.
|
||
|
|
||